ENERGY
AKDENİZ ELECTRICITY DISTRIBUTION INC.
Akdeniz Electric Distribution Inc. (Akdeniz EDAŞ) started its services upon being privatized on 28.05.2013. Our Company, operation conditions of which are regulated by Energy Market Regulatory Authority (EPDK), distributes the electricity obtained from the transmission points to the end users. Distributing 8,5 kWh electricity to approximately 1,7 million subscribers in Antalya, Isparta and Burdur where the company maintains its services, Akdeniz EDAŞ continues its uninterrupted and high quality distribution duty by adopting “towards much better with every passing day” slogan. Akdeniz EDAŞ maintains its activities focussing on service quality in electricity distribution with its human resources, training, research-development and the investments on information technologies and software as well as the investments on network renewal.
AKKÖY ENERGY INC.
Established in 1999, Akköy Energy Inc. undertook the establishment of the Akköy I HEPP, which is one of the important energy projects executed by private entrepreneurs in Turkey and completed with a total investment value of USD 120 million, and the Akköy II HEPP, estimated cost of which was calculated as EUR 320 million, within 49-year licence period and their commissioning and operation until the end of the license periods. The main partner of Akköy Energy Inc. with share rate of 97% is Kolin Construction Tourism Industry and Trade Inc. The 40-year professional experience, engineering know-how, market experience and its well-established trust in the market have become the main triggering force for Akköy Energy as other companies which are included in the Group and get involved in other sectors. The most important advantage of Akköy Energy Inc. in comparison with the other companies of the electricity market is that Kolin can establish and operate cost effective and productive facilities via competent and experienced personnel, professional experience, know-how and financial and technical capabilities. 


AKKÖY I HEPP
Constructed on Harşit River in Kürtün district of Gümüşhane, Akköy I Dam and HEPP has a roller-compacted concrete (RCC) body with a height of 54 m, an energy tunnel of 12,5 km in length and 3 Francis type turbines of vertical axis with 34.5 MWm inside (totally 103,5 MW). Commercial generation activities were started in the first two units of Akköy I HEPP as of 18 September 2008 and the third unit as of 26 November 2008. 


AKKÖY II HEPP
Akköy II HEPP Projects covers Aladereçam, Gökçebel and Yaşmaklı dams. Energy generation is ensured by transferring water of the dam to the Akköy II Hydroelectric Power Plant, adjoining to Akköy I HEPP, through an energy tunnel with a length of 4.033 m and an internal diameter of 4,00 m to the surge shaft and then to penstock with a length of 3.948 m and with a diameter of 2,70 m and gaining head of 1.220 m (the highest head in Turkey). Aladereça Dam within the scope of the project is located over Karaovacık Stream, in Gümüşhane, with a thalweg elevation of 1.797 m and the total water holding capacity of the dam is calculated as 13.934 million m3. The water accumulated in the reservoir of the Aladereçam Dam is diverted through an energy tunnel with a length of 4,7 km and an internal diameter of 3,20 m, a surge shaft and then a penstock with a length of 455 m and with a diameter of 1,50 m to Aladereçam HEPP with an installed capacity of 7 MW, and the water flowing through Aladereçam HEPP turbine pours at the outlet of the power plant into Gökçebel Dam. Gökçebel Dam is located on 1.630 m crest elevation over Gelavara Stream and constructed with a height of 144 m and in rock-filling type with front concrete cover. This dam is connected to the Yaşmaklı Dam reservoir through a transfer tunnel of 6.651 m in length and 4-m in diameter. Water holding capacity of the dam is calculated as 94,777 million m3. Yaşmaklı Dam is located on 1.630 m crest elevation on Gavraz Stream and constructed in concrete weight type with a height of 118 m. The concrete volume of the body of the dam is 613.000 m3. Water holding capacity of the dam is calculated as 19,707 million m3 Akköy II HEPP Project is on the first rank in Turkey and within top ten in the world in terms of the head height of 1.220 m. 

The power plant is operated with two Pelton- type turbines of vertical axis with installed power of 116,79 MW (233,58 MW in total) and with two synchronous generator of 135 MVA power. The first unit of Akköy II HEPP was opened on 7 June 2012 and the other unit was taken into operation for commercial generation activity on 5 July 2012.



Photos
ALBE ENERGY INDUSTRY AND TRADE INC.
Albe Energy, Electric, Electronic, Consulting, Advisory, Petrol, Mining, Agriculture, Livestock, Industry and Trade Inc. (Albe Energy) completed the construction of Yalnızardıç HEPP energy generation facilities, located on Gevne Stream in Alanya district of Antalya, within the framework of Electric Market Law No. 6446 and the energy generation is going on. The main partner of Albe Energy is Kolin Construction Tourism Industry and Trade Inc. The 40-year professional experience, engineering know-how, market experience and  its well-established trust in the markets have become the main triggering force for Albe Energy as other companies which are included in the Group and get involved in other sectors. The most important advantage of Albe Energy Inc. in comparison with the other companies of the electricity market is that Kolin can establish and operate cost effective and productive facilities via competent and experienced personnel, professional experience, know-how and financial and technical capabilities. The mentioned energy generation facilities which were licensed as Yalnızardıç HEPP on 11.03.2009 by the Energy Market Regulatory Authority (EPDK) includes Yalnızardıç Dam and HEPP and the regulator in its thailwag. The investment cost is USD 127.8 million. Total license installed capacity is 4 2.32 MW. Constructed on Gevne Stream in Alanya district of Antalya, Yalnızardıç Dam and HEPP has a roller-compacted concrete (RCC) body with a height of 97 m, an energy tunnel of 4.140 m in length and 2 power plants with Francis type turbines of vertical axis with an installed capacity of 16.25 MW (totally 32.50 MW) inside and a power plant with an installed capacity of 0.54 MW on the outlet of the tailwater let out from the dam. The crest elevation of the dam is 1.361 m and the tailwag elevation is 1.269 m. The concrete volume of the body of the dam is 490.000 m3. Water holding capacity of the dam is calculated as 109,5 million m3. The crest elevation and tailwag elevation of the regulator place in the tail of the Yalnızardıç Dam over Gevne Stream in Alanya district of Antalya is 1168,10 m and 1161 m respectively. The length of conveyance line is 3.847 m, and 2.627 m of it is tunnel. In the power plant, there are 4 Francis type turbines of horizontal axis, 3 of them with 1.45 MW and 1 with 4.93 MW (totally 9.28 MW) installed capacity. The first unit of Yalnızardıç Dam and HEPP was taken into commercial operation on September 2013 and the other three units on March 2015, April 2015 and May 2015 respectively.
BOĞAZİÇİ ELECTRICITY DISTRIBUTION INC.
Boğaziçi Electricity Distribution Inc. (BEDAŞ) started its services on 28.05.2013 after being privatized. BEDAŞ, operation conditions of which are regulated by Energy Market Regulatory Authority (EPDK), distributes the electricity obtained from the transmission points to the end users. Distributing 25 billion kWh electricity to approximately 4,7 million subscribers on a total area of 3,573 m2 on the European Side of İstanbul, BEDAŞ holds a feature of being the biggest distribution company of Turkey. BEDAŞ, adopting quality and continuous service principle, is the flagship of the sector with its market share of 13%. BEDAŞ maintains its activities focussing on service quality in electricity distribution with its human resources, training, research-development and the investments on information technologies and software as well as the investments on network renewal.
CLK ENERGY INVESTMENT INC.
CLK Energy provides service in energy sector by means of Akdeniz, Boğaziçi, Çamlıbel Energy Distribution and Retail Sales Companies and Wholesale Company in charge within the body of the Group. CLK Energy is among the leading groups of the industry with nearly 7.5 million subscribers across 7 provinces in 3 geographic regions. Establishing CLK Akdeniz Retail Sales, CLK Boğaziçi Retail Sales and CLK Çamlıbel Retail Sales; CLK Energy maintains distribution and retail sales operations separately. Also, there is CLK Energy Partnership Wholesale Company within the body of CLK Energy in order to carry out commercial activities for wholesale electricity. CLK Energy maintain its operation to provide the consumers with uninterrupted and quality service at Antalya, Burdur, Isparta, İstanbul European Side, Sivas, Tokat and Yozgat.
ÇAMLIBEL ELECTRICITY DISTRIBUTION INC.
Çamlıbel Electricity Distribution Inc. (ÇEDAŞ) started its services on 31.08.2010 after being privatized. ÇEDAŞ distributes 2.5 billion kWh electricity to approximately 765 thousands subscribers in its operation area of Sivas, Tokat and Yozgat. ÇEDAŞ maintains its activities focussing on service quality in electricity distribution with its human resources, training, research-development and the investments on information technologies and software as well as the investments on network renewal.


Photos
ESGAZ ESKİŞEHİR URBAN NATURAL GAS DISTRIBUTION INC.
As an affiliated company of Kolin Group of Companies, ESGAZ Inc. has been carrying out natural gas distribution activities within urban area of Eskişehir since 2004. The company meets about 3% of the domestic natural gas consumption demand in Turkey. Having adopted the principle of providing maximum service with minimum resource without sacrificing quality, the company is among the most productive companies in the natural gas distribution sector. With its projects and investments performed with experienced managers and personnel, it helps extend the use of natural gas on the one hand and ensures life and property security of the subscribers by being sensitive about the use of safe gas on the other hand. Total trade volume of natural gas of ESGAZ Inc. was 702 million sm3 in 2016. 295 million sm3 of this amount were delivered to subscribers and 31 million sm3 free consumers; and the remaining 376 million sm3 was the amount which was only transported. In 2016, infrastructure investments were completed in the newly established settlements and in Çifteler, Mahmudiye, Kırka, Alpu and Beylikova districts which were newly included in the distribution region. Within this scope, installation of approximately 155.000 meters PE main line, 103.000 meters PE service line, 66.882 meters steel line, 7.750 service boxes and 15 region regulators were made. On the other side, again in the same year, the existing pressure regulation and measurement stations in Muttalip and Zincirlikuyu regions were wholly renewed and the installation of a new station in Alpu and Beylikova districts to supply gas in these regions. The cost of all these investments made in 2016 was approximately 70 million TL. In 2016, on the other side, 1.237 BBS new subscribers were registered in Çifteler district, 200 BBS in Mahmudiye district, 193 BBS in Kırka district and 20.766 BBS in urban area. As of the end of 2016, total number reached to 400.000 BBS subscribers. The supply of natural gas to Alpu and Beylikova districts was ensured and new subscriptions will be started in early 2017. In addition, the expropriation works for the new transmission line of approximately 40 km for Sivrihisar district were completed and the investments in Sivrihisar district will also be completed within 2017. ESGAZ Inc. holds ISO 9001 Quality Management, ISO 14001 Environmental Management and OHSAS 18001 Occupational Health and Safety Certificates. In addition, ISO 27001:2013 Information Security Management Certificate was also obtained in 2016. With the high tax amounts, ESGAZ Inc. is among the Corporate Tax Champions of Eskişehir, and consequently this high added value contributes to both Eskişehir and national economy. The company was ranked as the 10th among the corporate tax payers of Eskişehir in 2015.

A pioneering step from ESGAZ Inc.
With its approximately 20-year natural gas experience, Eskişehir is one of the Turkey which met with the natural gas the earliest. However, both the natural gas network and the internal installations used by the subscribers are quite old, which requires periodic control of the relevant network and internal installations. In this regard, ESGAZ Inc. took the lead among the distribution companies and started periodic control of the internal installations of the subscribers in order to ensure safe gas use. Within the framework of this project, the public was informed through local press, District Governorships and Consumer Associations. Later on, starting from the oldest areas where the use of natural gas goes back to the farthest, necessary plans were made and informative meetings were held for the subscribers of the relevant regions to explain sensitivity and necessity of the problem. Due to interest and positive approach of the subscribers, internal installations of about 30.000 subscribers were controlled in 2016. It is planned to continue the relevant site works started in 2012 and being continued for four years, in the next years ahead in order to ensure safe gas use.


Photos
ETKI PORT MANAGEMENT NATURAL GAS IMPORT AND TRADE INC.
Opened on December 2016, ETKİ Floating LNG Storage and Gasification Unit (FSRU) is the third liquefied natural gas (LNG) storage and gasification terminal of Turkey. With the commissioning of the ETKİ FSRU terminal, a new natural gas supply point is brought to our country and a contribution will be made in the security of supply and variety of provision. By the reason of providing an opportunity for meeting the need of gas in the most economical way by supporting the daily natural gas consumption increasing especially in winter period via different resources and by evaluating the alternative provision opportunities whenever necessary, ETKİ FSRU terminal has a strategic importance for our country. 

Planned in the first phase to be established as a land terminal as in the other two models existing in Turkey (BOTAŞ Marmara Ereğlisi LNG Gasification Terminal and Egegaz Aliağa LNG Gasification Terminal), the facility project was revised as Floating LNG Terminal in accordance with the concerns of Ministry of Energy and Natural Resources and Energy Market Regulatory Authority (EPDK) to ensure the security of supply and variety of resources in our country; to enable the supply-demand equilibrium by creating a new point of inflow for meeting the natural gas consumption and to shorten the long installation and construction period of land terminal in accordance with the purposes towards enabling elasticity of supply in short term. While normal project periods of FSRU facilities are between 18 and 24 months, ETKİ FSRU was taken into operation within 6 months by being constructed with a record speed after the investment decision taken on June 2016. There are 24 floating LNG terminals as an example of professional engineering in the world and the number of these facilities is increasing due to their quick commissioning and flexible structure. Floating LNG Terminal which was firstly put into operation by ETKİ PORT MANAGEMENT in Turkey covers a ship with a storage capacity of 145.000 m3 LNG and a capacity of gasification of nominal 14 million m3 per day and 5 billion m3 per year; a pier with a length of 437 m enabling a secure LNG transmission from ship to ship; a gas transfer platform and a dolphin structure; a 36'' high pressure pipeline with a length of 14 km for connecting the terminal to the high pressure main transmission network of BOTAŞ (Petroleum Pipeline Corporation); ship-shore automation system integrating ship, structures on the pier and shore infrastructure by ensuring maximum safety in operations. 

HIDRO-GEN ENERGY IMPORT-EXPORT DISTRIBUTION AND TRADE INC.
Hidro-Gen Energy Import-Export Distribution and Trade Inc. (Hidro-Gen) is an affiliated company of Koling Group Companies and it was established in 2007. Hidro-Gen will generate electric energy by using the coal, which is also generated by itself in the mining site within the boundaries of Soma district in Manisa having a license no. S:34714 and belonging to Turkish Coal Enterprises Institution (TKİ), in the power plant of 510 MW to be also established by itself. Soma Kolin Thermal Power Plant Project is an important project for increasing the rate of the provision of energy demand in Turkey from the local resources. All of the main equipment to be used in the power plant are selected among the American-European origin equipment. The highest achievable value of efficiency will be obtained in the power plant to be established by using the state-of-art technology. A system for desulphurization unit with three-phase circulating fluidized bed is selected for the first time in our country. With this system, the applicable norms of both Turkey and Europe and also the emission norms likely to be reduced by 2020 by European Union will be ensured. Since the signature date of the royalty contract, the construction works have been started by obtaining all required permissions. In parallel with the due date of the power plant construction, the mining activities have been started, and the works as preliminary to the preparation of the pit have been going on. 

İZMİR NATURAL GAS DISTRIBUTION TRADE INC.
Emerging from the partnership of Kolin and  Türkerler Group, İZMİR NATURAL GAS is ranked among the leader companies of the sector with its innovative service understanding in both technological and operational terms. Expanding its natural gas distribution by adding Kınık, Ödemiş and Bergama districts into its network composed of İzmir and Tire district, İZMİR NATURAL GAS ensured the comfort of natural gas for a large part of its customer potential in its license area via the network investments, 23 A Type Pressure Reduction and Measurement Station and 142 Region Regulator. As of today, the company continues to provide uninterrupted and safe natural gas distribution service to its 756.947 BBS subscribers with an annual gas volume of 2,5 billion m3 via 4.640 km network. 

İZMİR NATURAL GAS has registered its quality-oriented approach with ISO 9001 Quality Certificate; its respect to environment with ISO 14001 Environment Certificate; its sensitivity to staff and 3rd parties with OHSAS 18001 Occupational Health and Safety Management System Certificate since its first day of operation. In addition to these, it has incorporated ISO 10002 Customer Satisfaction Management System with an approach suggesting that a proper and quality service becomes meaningful with customer satisfaction and ISO 27001 Information Security Management Systems to ensure the security of the information of all customers serviced. It has established an integrated system by gathering all of these management systems under a single roof. Opening Halkapınar Customer Services Centre in 2012, the Company enabled the management of customer demands by providing prompt and efficient solutions to all customers from single centre.
 
İZMİR NATURAL GAS, ranking among the leaders of the sector via the importance attached to the safety of its customers, has developed a new system in order to make 187 Emergency Response Teams reach the area of notice as soon as possible. With the new system named “Field Management System”, our quality and safe service understanding has been registered by enabling real-time monitoring and supervision of the team vehicles. 

Izmir, second most intensely industrialized region of Turkey, is also ranked on the 2nd level in terms of export-import coverage ratio. In the cities where the industry and exportation are developed, the widespread use of natural gas is inevitable. Therefore, our Company will always remain on the first ranks in Turkey in terms of natural gas transfer potential. One of the most important contributions for İzmir and residents of İzmir is the effect of the natural gas on the breathable air quality of İzmir. Increase of the subscribers in parallel with the generalization of natural gas has played an important role in preventing the intense air pollution of İzmir and granting a liveable urban structure of modern standards. The Company which has adopted a principle to support various social campaigns in İzmir becomes sponsor of the activities of local administrations and various non-profit organizations and also through the projects it produces and implements by itself, it contributes to art and culture life of İzmir and its residents. It is especially important to raise awareness of children about environment and energy within the framework of its social responsibility. Among many social responsibility projects executed by company, there are such traditionalized projects as Theatre Workshop, Turkish Art Music Chorus, Inter-School Drawing Picture Competition and Photograph Competition. 



Photos
KOLEN ELECTRICITY WHOLESALE IMPORT AND EXPORT INC.
KOLEN's target is to become an efficient solution partner of energy, a brand preferred primarily and shown appreciation, where product, service, and solution are sought principally, by means of not only group productions, but also cost-oriented outsourcing, as well as balanced portfolio structure free from potential risks, in the liberalizing electricity market. KOLEN staff adopts the satisfaction of their subscribers as their principle target and corporate understanding. 

Being aware of that this satisfaction is related with achieving a quality on the highest level in all fields where a contact is ensured with KOLEN, the Company plans all its business processes, takes initiatives and makes decisions accordingly. KOLEN also attaches importance to internal customer satisfaction and team spirit. It supports this spirit and feeds it. The team of KOLEN is an interconnected and motivated team and a family. In addition to obtaining electricity with a reduced price, the KOLEN subscribers do not face with an unlikeable situation other than the ones committed to them and maximum effort for that is shown. The invoicing system is transparent. People enter in the KOLEN invoicing system, when desired, and can reach their past invoices. They take their invoices and other important notification via e-mail and SMS as well. KOLEN subscribers reach the energy consultants very easily and obtain clear and satisfying answers for their questions. KOLEN continues to grow in three fields with this perspective. 

1. Operation: The required reporting systems have been completed and systemized. The invoicing system has been developed, invoice collection channels have been increased and the portfolio has been rendered as the most possible risk free under the market conditions. 

2. Trade and Provision: The aim in this field is to increase the energy provision and trade portfolio and business volume, to create synergy especially in retail sale channel and to improve company profitability. A parallel development with the expected aim is going on.

3. Marketing and Sales: In the organization of dealership starting with Ankara, İstanbul, İzmir, Eskişehir and Gaziantep and continuing with Samsun, Elazığ, Malatya and Adana, the number of business partners has reached about a hundred. The dealership demands of the entrepreneurs which are well known in their regions, maintain a business close to our sector and provide consulting and advisory services are still evaluated. Dealership granting is still going on. Including the distinguished brands of Turkey into its portfolio as subscriber, KOLEN have corporate consumers, Small and Medium Sized Enterprises (SME), retail customers and public enterprises. KOLEN, gaining over 100% growth in 2014 and 2015, plans to reach growth over 100% with a electricity sales volume of 1 billion and 360 million kWh in 2016.
NATURGAZ NATURAL GAS IMPORT AND EXPORT INDUSTRY AND TRADE INC.
Naturgaz Natural Gas Import and Export Industry and Trade Inc. stepped in the natural gas market with the Natural Gas Wholesale License obtained from the Energy Market Regulatory Authority on 04 October 2007. Naturgaz Inc. converted the wholesale license into the import license (SPOT LNG) on 17 February 2011. The Company has been still making gas supply in İzmir and Eskişehir Distribution Regions in changing rates since 2010, and started to supply natural gas to the customers on free consumer status through its pipelines as of 2016. Thus, Naturgas made natural gas trade of approximately 500 million m3 by increasing its market share to 1% in 2016.

The company carries out the day ahead and day end transactions, even more over-the-counter natural gas transactions together with the other suppliers of the natural gas wholesale market, performs the natural gas trade actively and its trade volume in the market increases day by day. Following diversification of the natural gas supply, transparency of the commerce centre and balancing market mechanisms; it will continue the national and international works to apply the suitable strategies to the management of price risks, its own cost structure and the requirements of the customers.
TKD NORTH ENERGY GENERATION INC.
As TKD North Energy Generation Inc., the operation rights of Torul Dam and HEPP, Kürtün Dam and HEPP and Doğankent Rgulator and HEPP facilities located on Harşit Stream in Gümüşhane and Giresun within the framework of Law on Privatization Applications No. 4046 was obtained and the energy generation within the framework of Electricity Market Law No. 6446 is still going on. The installed capacity of Torul Dam and HEPP is 105,6 MW. Torul Dam and HEPP taken into operation for energy generation by EÜAŞ (Electricity Generation Company) in 2009 will be operated for 49 years by TKD North Energy Generation Inc. as of 29.04.2016. The installed capacity of Kürtün Dam and HEPP is 85 MW. Kürtün Dam and HEPP taken into operation for energy generation by EÜAŞ in 2003 will be operated for 49 years by TKD North Energy Generation Inc. as of 29.04.2016. The installed capacity of Doğankent Regulator and HEPP is 74,5 MW. Doğankent Regulator and HEPP taken into operation for energy generation by EÜAŞ (Electricity Generation Company) step-by-step in 1971, 1978 and 1981 will be operated for 49 years by TKD North Energy Generation Inc. as of 29.04.2016.