Construction of the Anafartalar-HST Tram Line and the Procurement, Installation and Commissioning of Electromechanical Systems and Vehicles

The project scope includes the construction of the Anafartalar-HST tramline, and the procurement, installation and commissioning of the electromechanical systems and vehicles. The line is 7.07 kilometers long and features a total of nine stations of which four have island platforms and five have side platforms.

The following works are to be carried out and commissioned as part of the of rail system line: Within the scope of construction and infrastructure works, earthworks, infrastructure works and displacements, drainage lines, line superstructure (tracks, turnouts, bearing blocks, under-track concrete paving, and so on), building works (water reservoir, transformer buildings, and so on), and station canopies, within the scope of mechanical works, heating, ventilation and air conditioning installations, sanitary installations, rainwater installations, fire protection installations, pumps and compressed air installations, and within the scope of electromechanical tasks, power supply and electrification systems, signaling systems, and communication and control systems. In addition, five trams to be used for passenger transportation on the route will be provided and commissioned as part of the project.

Employer: Republic of Turkey, Ministry of Transport and Infrastructure,
Directorate-General of Infrastructure Investments
Location: Kayseri/Turkey