Akköy I HEPP Project

The Akköy I Dam and HEPP project, built within the borders of the Gümüşhane province and planned to produce an annual electrical power of 320 gigawatt hours, uses the slope provided by the 12,430-meter-long energy tunnel and dam located on the Harşit River and on the lower course of Kürtün Dam.
The Akköy I HEPP Project contains three turbines, each with a capacity of 34.5 megawatts, providing a total installed power of 103.5 megawatts.

Employer: Akköy Enerji A.Ş.
Location: Gümüşhane / TURKEY