Construction of Ismayili City Potable Water Supply and Sewerage System and Waste Water Treatment Plant

The works within the scope of the Ismailli project are as follows:
•Construction of water supply lines using HDPE pipes with diameters ranging from 110 millimeters to 630 millimeters, and with a length of 190,907 meters.
•Construction of sewerage lines using CHDPE pipes with diameters ranging from 200 millimeters to 600 millimeters, and with a length of 151,744 meters.
•Construction of three deep well pumping stations to supply the drinking water network, which has a capacity of 15 liters per second.
•Construction of the catchment system that has a capacity of 65 liters per second and consists of 3 caisson wells and 120 meters of perforated pipe.
•Construction of three drinking water storage reservoirs with a respective capacity of 30, 50 and 100 cubic meters.
•Construction of five drinking water reservoirs with a total volume of 4,400 cubic meters:
•Establishing the connection of the domestic drinking water network, which includes 6,000 water meters
•Establishing the connection of 5,808 domestic sewerage lines
•Construction of a treatment plant with a daily treatment capacity of 6,232 cubic meters (30,000 population equivalent)
•Construction of a wastewater pumping station with capacity of 180 liters per second

Employer: Azerbaijan Republic, Rehabilitation and
Water Management Company
Location: Ismayili/AZERBAIJAN

GALERİ