The project included the execution of reinforcement, injection and concrete coating works of two reinforced concrete-coated tunnels, each 26 kilometers in length located between the Atatürk Dam and the Harran Plain Main Channel, connection tunnels and transport tunnels along the main tunnels.
Employer: DSI General Directorate
Location: Şanlıurfa / TURKEY