Ankara-Pozantı Highway, Gölcük-Kemerhisar Section and Kemerhisar and Niğde Connection Road

The work done within the scope of Kemerhisar and Niğde Connection Roads (62.2-kilometer Kemerhisar–Pozantı Highway Section) includes Ground Leveling, the construction of Large and Small Engineering Buildings, Superstructure, Security, Traffic, Landscaping, Miscellaneous Works and Secondary Works. This road has bridge intersections, underpass bridges, overpass bridges, pedestrian overpass bridge, culverts and service culverts with various measurements. There is a 62.2-kilometer-long highway, including a 41-kilometer-long highway section and a 21.2-kilometer connection road.

Employer: General Directorate of Highways
Location: Niğde/TURKEY

GALERİ