Ankara–Sivas Railway Project, Completion of Infrastructure in Kırıkkale–Yerköy (Section II)

Within the scope of the project, which has a route length of 79.6 kilometers, one NATM Tunnel (total: 502 meters),two viaducts, four underpasses, two overpasses, one bridge, 12 culvertrs and canal transition structures were constructed.

Employer: General Directorate of Turkish State Railways
Location: Kırıkkale/TURKEY

GALERİ