Construction of Artvin–Erzurum State Road (Km: 85 + 100-103 + 482.36) and Artvin–Erzurum Junction–Oltu–Olur State Road (KM: 0 + 000-10 + 160)

The route is the relocation road for Yusufeli Dam, which is being constructed by DSI General Directorate. It consists of two parts [(km: 85 + 100-103 + 482.36 section of Artvin–Erzurum State Road and KM: 0 + 000-10 + 160 section of 060-01 KKN (Artvin–Erzurum Junction)–Olur–Oltu State Road]. Artvin–Erzurum State Road is 18.5 kilometers long and consists of nine tunnel passes with a total length of 15 kilometers. Artvin–Erzurum Junction–Olur–Oltu State Road is 10 kilometers long and consists of eight tunnel crossings.

Employer: General Directorate of Highways
Location: Artvin/TURKEY