Construction of North Crossing Avenue in Kayseri (Infrastructure, Superstructure and Signaling)

The project passes through the north of the Kayseri City Center and includes the construction of a 23-kilometer double track railway at high-speed train standards. Within the scope of the project, infrastructure transmissions, the construction of Otogar Bridge and Erkilet Bridge with a double-span each, 9 highway underpasses and pedestrian underpass, three overpasses, 26 culverts, excavation and filling, production of a rammed earth wall for the bridges and overpasses, sub-base, sub-ballast and ballast laying, and a 30-kilometer railway line have been completed.

Employer TCDD General Directorate
Location: Kayseri / Turkey 