Reconstruction of Infrastructure and Superstructure between Başpınar–Gaziantep–M.Yavuz Stations (GAZIRAY)

The 25.5-kilometer-long railway line, of which five kilometers is underground (between the Train Station and Bus Station), consists of four lines: two suburban trains and two high-speed trains. Its construction included all infrastructure and superstructure works, piled cut-and-cover structure, all infrastructure displacement works, railway station structures and landscaping. Escalators and elevators were built and all finishing works (including electrical works) were completed within the scope of this project. Integrated with the light rail system, this project will greatly contribute to urban transportation by servicing 100,000 passengers per day.

Employer: General Directorate of Turkish State Railways
Location: Gaziantep/TURKEY