Construction of a 950-bed state hospital in the Aydın Central Efeler district, commissioned by the General Directorate of Health Investments.
The project includes the construction of a reinforced concrete superstructure of the hospital building (two basement floors, a ground floor and eight typical floors) and a reinforced concrete technical center building (basement floor, ground floor and a typical floor). The construction of the hospital’s superstructure and the technical center building as part of the construction works for the Aydın 950-Bed Integrated Health Campus (State Hospital) will be completed within 750 days and will cover architectural works, reinforced concrete construction, mechanical installation, electrical wiring, infrastructure and landscaping.