Infrastructure Works for the Ankara–Izmir High-Speed Train Line Project, Eşme–Salihli Section

Within the scope of the project, which has a route length of 74.4 kilometers, 24 NATM tunnels (19.68 meters total length), 1 TBM tunnel (3.05 meters total length), 21 viaducts, 58 cut-and-covers, 38 underpasses, 12 overpasses, and 151 culvert structures will be built. Additionally, excavation and filling works will be carried out. The TBM Tunnel to be built as part of the project will have a diameter of 13.7 meters, which will be the longest in Turkey.

Employer: General Directorate of Turkish State Railways
Location: Manisa/TURKEY

GALERİ